Working closely with builder and architect.

Project Overview

Location:
Castlemaine
System size:
10 kW
Panels:
23 x 435W Winaico
Inverter:
Fronius Primo GEN24 x 2
Install date:
November 2023
Generating:
Over 37 kWh per day
Detail:

Central Spark responded quickly to tight timelines during this project. A design was proposed with days, as was a pre-wire during a tight time window, with final fit-off several months later. https://www.hovedesign.com.au/